More Time To Repent

General comments and chit-chat, or tell us how we can improve KiasuParents.com

More Time To Repent

Postby raysusan » Wed Nov 23, 2011 9:23 am

Once upon a time we were told the MRT congestion could not be relieved owing to constraints in the existing signalling system. Yesterday, Minister of State (Transport) Josephine Teo said there are simply not enough trains to run two-minute intervals throughout the morning and evening peak periods.

It was announced that a total of 35 trains will be added to the present fleet in the next 4 years. 5 arrived in May, but we are not told if they have been put in service. "We are fully committed to expanding the train fleet in order to improve frequencies in order of train arrivals," she chirped to a skeptical public. "You can always take the next train," was no longer politically acceptable.

Teo blamed the manufacturers for the tardy progress in the production line. The world has only a handful of train makers she claimed, naming Siemens (German), Alstom (French) and Bombardier (Canadian). Obviously she hasn't heard of other players like Hyundai-Rotem and the Chinese builders for the Chinese Ministry of Railways (MOR). Incidentally Bombardier's Derby plant is cutting jobs after losing the big Thameslink contract to Siemens - they should be hungry for a Singapore order. Building rolling stock is not exactly rocket science. Has anybody considered our local shipyards who construct engineering behemoths like state of the art floating rigs for deep sea exploration offshore Brazil? In the heydays of the containerisation buildup, many of the trailers and prime-movers for the container port were assembled from components sourced from Fruehauf and other brand names; the formula could be repeated.

Teo gave another excuse for the wait. The bigger fleet will take advantage of the new signaling system which reduces the spacing between trains, scheduled to be ready only by 2016. There will be no shortcut, the period for repentance will not be abbreviated.


To Gerald Giam's question if there was "no forward planning done", Teo answered, "there is advance planning but projecting demand and ridership is tricky business and hard to get 100-percent right". The same excuse could have been made for the housing shortage, hospital shortage, flood controls shortage. And have you seen the graph for economic growth? Even a drunk driver can steer a straighter line. Definitely lots of slapping required.

Source: Singapore Notes: More Time To Repent

raysusan
KiasuGrandMaster
KiasuGrandMaster
 
Posts: 1417
Joined: Tue Jul 22, 2008 12:13 pm
Total Likes: 6


Re: More Time To Repent

Postby UncleLim » Sat Dec 03, 2011 1:35 pm

Aiya... I thought you have inside news that the world is not ending in 2012. :wink: :wink:

UncleLim
BrownBelt
BrownBelt
 
Posts: 682
Joined: Sat Jan 09, 2010 10:47 am
Total Likes: 7


Re: More Time To Repent

Postby concern2 » Mon Dec 05, 2011 9:25 am

UncleLim wrote:Aiya... I thought you have inside news that the world is not ending in 2012. :wink: :wink:


:goodpost: Rhaha! Yeah...what's new, right?

concern2
KiasuGrandMaster
KiasuGrandMaster
 
Posts: 4895
Joined: Mon Oct 20, 2008 4:18 pm
Total Likes: 29



Return to Recess Time