The Write Tribe

service provider image
Featured
Type of Service:

Enrichment Services, Tuition Centre/Private Tutor

Address:

291 Yishun Street 22, #02-355, 353, 351 (Above Unity Pharmacy), Singapore 760291

Telephone:
Instagram:
Description:

Specialises in both Composition Writing and English Mastery classes for primary and secondary students.

Structured exam writing with measurable score improvement.

 

The Write Tribe specialises in Composition Writing and English Mastery programmes for Primary and Secondary students.

Aligned with the MOE English curriculum, our classes are exam-focused and results-driven, designed to build strong language mastery, confident writing, and exam-ready skills.

Students write compositions weekly with compulsory rewrites, ensuring hands-on improvement through targeted feedback. Every 8 weeks, students sit structured written tests, and progress reports are sent to parents to highlight performance trends and identify weaker composition themes early.

With a practical, structured teaching approach, supported by interactive in-house assessment books (online classes only), our students consistently achieve strong results in PSLE and O-Level English.

We offer lessons from Primary 1 to Secondary 5, available in both Online and Offline formats.

📍 Online Classes: 8749 1430
📍 Offline Classes: Yishun (limited slots)

 

#1 Weekly Composition Writing
 

Our Signature Two-Stage Mastery System

Each composition topic is attempted twice to ensure mastery and confident application.

Week 1 — Guided Composition
Teachers use our detailed story roadmaps to model exactly how to approach the topic, including planning, plot development, and language application.

Week 2 — Independent Writing
Students attempt the same topic independently as a timed mini test to assess retention, structure, and exam readiness.

Across both lessons, teachers conduct a 45-minute intensive story roadmap session, regardless of whether the lesson is guided or independent. This ensures every student receives clear, structured instruction on how to plan, develop content, and score effectively.

#2 Structured Exams Every 8 Weeks
 

Primary 3–4
• Two Continuous Writing tests

Primary 5–6
• One Situational Writing test
• One Continuous Writing test
 

#3 Parent Progress Reports (Every 8–10 Weeks)

Parents receive a structured report showing:

  • their child’s composition scores

  • key themes or topics that are consistently affecting results

Progress Report.jpg

#4 Two-Stage Rewrite & Feedback System

Compulsory rewrites ensure measurable improvement.

Stage 1 — Draft Marking
Content, grammar, clarity and structure are assessed and graded.

Stage 2 — Handwritten Rewrite
Targeted feedback guides score improvement:
14 → 16 / 20 (P3/4)
26 → 28 / 36 (P5/6)

 

#5 Interactive Assessment Books (Online Classes Only)
 

Exclusive in-house digital books strengthen grammar, vocabulary and descriptive language.

Auto-marking makes practice fast, engaging and effective. Free for our students.

FREE_RESOURCES.jpg

Inside a 1.5–2 Hour Write Tribe Online Lesson

• Theme & story roadmap breakdown (20–30 mins)
• Story planning using proprietary tools
• Live timed writing with real-time guidance (45–60 mins)
• Assessment book practice for language strengthening (20–30 mins)

Inside a 1.5–2 Hour Write Tribe Physical Lesson

• Theme & story roadmap breakdown (20–30 mins)
• Story planning using proprietary tools
• Writing with real-time guidance (45–60 mins)
• Extra rewrites with teacher feedback (20–30 mins)

Learn more about our Primary 1–Secondary 5 classes. We offer both exam preparation programmes and essay writing courses. Click here to view class details and pricing for all levels.

Proven Track Record: Strong results across PSLE and O-Levels. Learn more about our structure and book a trial class here.

 

2025 EOY RESULTS (Hall of Fame)

Hall of fame - online.png

Hall of fame - physical.png

No time for regular lessons? Try our Ad-Hoc Composition Marking Service (P1–P6).

MOE-aligned feedback using detailed marking rubrics. Strictly subject to availability.  Click here to learn more

 

Composition Marking Service.png

 

Free Resources

Try SAMPLES of our MOST POPULAR assessment books!

writetribe kids.jpg